SGL Project Showcase: Warsaw Corporate Campus — Aluminum Curtain Wall & Security Doors

Project Overview

  • Project Name: Vistula Corporate Campus - Tower A & B
  • Project Type: Grade-A Commercial Office Complex
  • Location: Warsaw Business District, Warsaw, Poland
  • SGL Products: Aluminum thermally broken curtain wall, aluminum casement windows, RC3 steel entry doors, aluminum folding entrance systems
  • Scale: 86,000 m² gross floor area, 22-story twin towers
  • Completion: Q3 2025
  • Client: Pan-European Real Estate Development Group

 

The Project

 

The Vistula Corporate Campus represents one of Warsaw's most ambitious commercial real estate developments of the decade - twin 22-story towers spanning 86,000 m² of Grade-A office space, connected by a 4-story retail and hospitality podium. Positioned on the Vistula riverfront, the project demanded a fenestration solution that could deliver the visual drama of a near-fully-glazed façade while meeting Poland's strict energy efficiency codes and the client's equally stringent security requirements.

 

SGL was selected through a competitive tender process over four European and two Asian manufacturers. The selection criteria weighted three factors equally: technical certification compliance (EN 1627, EN 1279 thermal), supply chain reliability across an 18-month delivery schedule, and post-installation technical support capability in the European market.

 

news-1672-941

 

Client Challenges

 

Challenge 1: Thermal Compliance Under Polish Energy Regulations

Poland's WT 2021 (Warunki Techniczne 2021) regulations set maximum Uw values of 1.1 W/m²K for windows in commercial buildings and 1.3 W/m²K for curtain walls. With 72% glazed façades on the tower elevations, achieving these values required a thermally broken aluminum system capable of consistent factory-controlled U-value performance at scale.

Initial architectural specifications called for a floor-to-ceiling vision height of 2.85m per floor - requiring unitized curtain wall modules spanning full story heights with minimal visible sightlines.

 

Challenge 2: Security Specification for High-Profile Tenant Requirements

The development's anchor tenant - a multinational financial services corporation occupying floors 8–16 - specified EN 1627 RC3 minimum for all core access doors, with RC4 required for two dedicated server room and vault access points. Traditional commercial aluminum door systems could not meet RC3 at the required aperture sizes (900×2100mm double-leaf configurations).

 

Challenge 3: 18-Month Delivery Window with Zero Schedule Delay Tolerance

The development timeline was tied to a pre-agreed tenant occupation date carrying substantial financial penalties for delay. SGL was required to deliver in 14 batches over 18 months, synchronized with each floor's construction completion - meaning no batch could arrive early (limited on-site storage) or late (construction halt implications).

 

Challenge 4: Coastal-Equivalent Corrosion Environment

Warsaw's location in an industrial belt, combined with the project's proximity to river moisture and winter road salting, required corrosion performance equivalent to Category C4 (ISO 12944) - the classification typically applied to coastal industrial environments.

 

SGL Solution

 

System 1: Unitized Aluminum Curtain Wall (Tower Façades)

 

System specified: SGL UCW-3500 Unitized Curtain Wall System

 

Parameter Specification
Module dimension 1,500mm × 2,850mm (floor-to-ceiling unit)
Frame material AA6063-T5 aluminum, 2.0mm min wall thickness
Thermal break 34mm polyamide thermal break (Ensinger Insulbar)
Glazing Triple-glazed units: 6mm / 20mm argon / 4mm / 16mm argon / 6mm
Low-E coating Guardian ClimaGuard Premium 2T (Ug = 0.5 W/m²K)
Uw (frame + glass) 0.89 W/m²K (tested to EN ISO 10077-2)
Air permeability Class 4 (EN 12207)
Water tightness Class E1200 (EN 12208)
Wind resistance Class C5 (EN 12210) - tested to +3.2 kPa / -4.8 kPa
Surface finish Powder coat RAL 7016 Anthracite Grey, 80–100 micron, Qualicoat Class 2
Corrosion rating ISO 12944 C4 compliant

 

Total curtain wall supply: 4,214 unitized modules covering 9,680 m² of façade area.

 

news-1672-941

 

System 2: Aluminum Thermally Broken Windows (Podium & Internal Cores)

 

For the 4-story podium retail and office levels and all internal partition glazing, SGL supplied its AL-860TB casement and fixed window system:

  • U-value: 1.08 W/m²K (with double glazing)
  • Frame depth: 86mm with 28mm polyamide thermal break
  • Opening configurations: Fixed, top-hung vent, parallel vent
  • Glazing: 4/16argon/4 double glazed, Guardian SN72 Low-E
  • Quantity: 847 window units across 11 configurations
news-1080-1440
news-1080-1440

System 3: Steel RC3 Security Entry Doors (Core & Server Room Access)

 

System specified: SGL Steel Security Door Series SD-RC3 and SD-RC4

 

Parameter RC3 Specification RC4 Specification
Certification EN 1627:2011 RC3 EN 1627:2011 RC4
Test laboratory Institut für Fenstertechnik (ift) Rosenheim ift Rosenheim
Door leaf thickness 72mm 84mm
Steel core 3mm cold-rolled steel skin + honeycomb steel core 4mm + reinforced steel frame
Lock system 5-point multipoint Mul-T-Lock + motorized deadbolt 7-point + Abloy Protec²
Hinge system 5× anti-lift welded hinges 7× reinforced welded
Frame 100mm steel frame, 4mm wall 120mm steel frame, 5mm wall
Aperture 900×2100mm (single) / 1600×2100mm (double-leaf) 900×2100mm
Finish Powder coat RAL 7016 / 7021, C4 As specified
Quantity 164 units 16 units

 

 

news-1672-941

 

System 4: Aluminum Folding Entrance Systems (Lobby)

 

The twin tower lobbies each required a 12-meter wide folding glass entrance wall - a showpiece architectural element requiring custom engineering:

  • System: SGL Folding Door System FD-80
  • Opening width: 12,000mm per tower
  • Module: 9 panels × 1,333mm per tower
  • Glass: 12mm toughened laminate (6+0.76PVB+6), clear
  • Operation: Motorized (Dorma Agile 150) with manual override
  • Frame: 80mm aluminum, powder coat RAL 9005
  • Wind load certification: EN 12210 Class C2

 

news-1672-941

 

Implementation Highlights

 

Factory-Level QA Integration

 

Given the project's scale, SGL implemented a dedicated quality assurance protocol mirroring the project's ISO 9001-compliant construction management system:

  • Each curtain wall module was factory-tagged with a QR code linking to its test records, production date, glazing batch number, and powder coat batch reference
  • Inspection reports were shared with the project's independent technical auditor (ITA) via shared BIM model integration
  • Zero rework incidents were recorded across the 4,214-module supply - a result attributed to SGL's in-factory thermocycle testing of 2% of modules per batch

 

Phased Delivery Execution

 

Delivery Batch Content Delivery Week Construction Floor
Batch 1 Podium entrance systems + RC4 doors Week 4 Podium Level 1
Batch 2–3 Tower A floors 1–6 curtain wall Week 8–12 Tower A L1–L6
Batch 4–5 Tower B floors 1–6 + core doors L1–8 Week 14–18 Tower B L1–L6
Batch 6–10 Tower A & B floors 7–16 Week 20–36 Mid-rise floors
Batch 11–14 Floors 17–22 + snag inventory Week 40–52 Upper floors

 

All 14 deliveries completed on schedule. Zero critical path delays attributable to SGL supply.

 

On-Site Technical Support

 

SGL deployed two resident technical advisors on-site from Week 4 through Week 54 to support:

  • Unitized module installation guidance (SGL proprietary installation method)
  • On-site glazing quality inspection
  • Hardware commissioning for all 180 security doors
  • Preparation of as-built documentation and O&M manuals

 

Project Results

 

Performance Indicator Target Achieved
Uw curtain wall (tested in-situ) ≤1.3 W/m²K 0.91 W/m²K
Uw windows (tested in-situ) ≤1.1 W/m²K 1.05 W/m²K
Air permeability test (EN 13829) Pass Class A Class A - Pass
Water tightness test No leaks at 600 Pa No leaks at 900 Pa
Security door certification RC3 all core doors RC3 confirmed + RC4 vault
On-time delivery rate 100% 100% - all 14 batches
Installation defect rate <0.5% modules 0.11% (5 modules reworked)
BREEAM credit contribution Credits for façade 6 BREEAM credits contributed

 

news-1672-941

 

BREEAM Excellent Certification

The Vistula Corporate Campus achieved BREEAM Excellent at practical completion - the highest BREEAM rating awarded to a commercial development in Poland in 2025. SGL's façade systems contributed directly to 6 BREEAM credits across energy (Ene 01, Ene 04) and materials (Mat 01, Mat 03) categories, primarily through:

  • High recycled content aluminum (73% recycled material)
  • Demonstrated thermal performance reducing building energy demand by 23% vs. the WT 2021 reference case
  • Qualicoat Class 2 powder coating eliminating VOC-emitting solvent finishes

 

Client Testimonial

 

"SGL's ability to engineer a curtain wall system meeting 0.89 W/m²K at the scale of two 22-story towers - while simultaneously delivering a certified RC3/RC4 steel door system - demonstrated technical breadth we hadn't seen from a single-source supplier. The phased delivery performance was frankly exceptional: 14 batches, zero critical delays, two resident technical advisors on-site throughout. This project has cemented SGL as our preferred fenestration supplier for our European pipeline."

 

- Head of Procurement, Pan-European Real Estate Development Group (name withheld per client request)

 

Key Success Factors

 

  1. Single-source supply: Coordinating curtain wall, windows, and security doors through a single supplier eliminated inter-system compatibility issues and simplified the project's supply chain management.
  2. Pre-certification at scale: SGL's RC3/RC4 steel door systems arrived pre-certified with ift Rosenheim test documentation - eliminating the need for on-site or third-party testing, which would have added 6–8 weeks to the security door program.
  3. BIM-integrated delivery management: Integration with the project's BIM model enabled floor-level delivery scheduling that matched construction sequencing, eliminating on-site storage constraints and protecting all modules from site damage.
  4. Resident technical advisory: Having SGL technical staff on-site throughout the installation phase reduced RFI (Request for Information) response time from the typical 3–5 day industry standard to same-day resolution, maintaining installation momentum.

 

About SGL Doors & Windows

 

SGL is a specialist manufacturer of aluminum, steel, and uPVC windows and doors for commercial and high-end residential projects globally. With production facilities certified to ISO 9001:2015 and a dedicated export team serving Europe, North America, the Middle East, and Central Asia, SGL supports projects from specification through post-installation technical service.

 

Interested in a similar project? Our commercial team provides:

  • Technical specification support
  • Certified system selection guidance
  • Project-specific pricing within 5 business days

 

Related Products: SGL Curtain Wall Systems | SGL Steel Security Doors | SGL Aluminum Windows
Related Case Studies: Kazakhstan Residential Complex | High-Rise Window Solutions
Contact: Request Commercial Project Consultation

 

 
Our Products
 
 

news-1080-1080

SGL Curtain Wall Systems
 

news-2181-2181

SGL Steel Security Doors
 

news-720-720

SGL Aluminum Windows

 

 

Send Inquiry

whatsapp

Phone

E-mail

Inquiry